Hello, this is Takamatsu of Relatec. Relatech is in charge of public relations, personnel affairs, and technology support.
As for the recent in the company, the number of on -site business trips on the observation team (such as the installation of ridors and fuel cells) of the observation team was flying around the country.On -site work can be dangerous, so I'm really glad I was able to reach the end of a year without a big accident or injury.
Hello, this is Taiuchi and Mito in Relatech. It will be early this spring,I visited the construction site of the offshore wind power plant off Irizen -cho, Toyama Prefecture.This time,We will deliver the feeling of visiting the Irizen -cho Okiwai WF from each perspective.
Hello, this is Shintaku from Rera Tech.. I'm in charge of wind resource simulation and analysis.
Last time, the first part of "About the construction of offshore windfarm and the type of ship "About the construction of offshore windfarm I introduced it. This time, the second part is about the ship used in the construction of a offshore windfarm.
There are about 10 types of ships used when installing offshore wind power generation equipment. Ships specializing in each work are active during construction and operation.
Hello, this is Shintaku from Rera Tech inc.. I'm in charge of wind simulation and analysis. The new year has begun. At Kobe University, which is located in the Rera Tech headquarters, I feel the liveliness of the new year. The innocence of students who seem to be new students is spilled. I would like to cherish the challenge spirit for a year so that I will not lose to an energetic student.