The scanning rider (SL) was removed. Since the vertical rider (VL) is about 50 kg, it is possible to install, move, and remove it, but the SL is about 200 kg, so heavy equipment is essential.
At the ventilation observation site, etc., it is used for pre -field surveys before the rider installation (understanding the surrounding terrain and trees) and confirmation after the rider installation (understanding the position relationship with the mast).
Japan's first implantable (gravity type) We visited Choshi -off offshore wind power plant, a demonstration test machine for offshore wind power generation.
A vertical doppler rider WindCube V2.1 has been installed. An independent power supply that combines a PV panel and a battery is designed and installed, enabling 24 -hour monitoring of solar radiation and power generation status by remote monitoring system.
At Kobe University / Osaka Institute of Technology JST Score Business DEMO Day
Our representative director and advisor announced.
The presentationYouTubeIt is uploaded to.